EPC for SUB STATION 66KV TO 400KV

    An EPC (Engineering, Procurement, and Construction) project for substations ranging from 66 kV to 400 kV involves several crucial stages. Here’s a structured overview of the key components:

  • Design Development: Create detailed designs for the substation layout, including:
  • Equipment selection (transformers, switchgear, busbars, etc.)
  • Protection and control systems.
  • Grounding and earthing systems.
  • Operational Handover: Provide operational training and documentation for the client.
  • Maintenance Planning:
  • Develop a maintenance schedule to ensure long-term reliability and performance.
  • Stakeholder Engagement: Implement strict safety standards throughout construction and operation.
  • Safety Protocols: Implement strict safety standards throughout construction and operation.
  • Regulatory Compliance: Ensure adherence to local and international electrical standards and regulations.